Our works included the identification and sealing of leakage points, the excavation and replacement of damaged drainage lines, and the installation of new rainwater collection and redirection systems. Surface restoration and concrete apron repairs reinstated structural integrity, followed by full testing, commissioning, and flow-performance validation — safeguarding critical airport infrastructure and restoring reliable, long-term drainage.